Skip to main navigation.

Rates

Reminder: The rates listed below took effect for all billings dated January 1, 2017 or later.

RATE CLASSIFICATION
RATE

RESIDENTIAL

Access Fee Single-Phase
Energy Charge

 

Access Fee Three-Phase
Energy Charge

$27.50
$0.10450

 

$30.50
$0.10450


OPTIONAL RESIDENTIAL TIME-OF-USE
On Peak: 6:30am - 11am & 5:30pm - 9:30pm; Monday through Saturday (October through April)
Off Peak: All other times

Access Fee Single Phase
Access Fee Three Phase
On-Peak Energy Charge
Off-Peak Energy Charge

$27.50
$30.50
$0.16300

$0.06550


SMALL COMMERCIAL SINGLE PHASE

Access Fee
Energy Charge

$28.00
$0.10850


SMALL COMMERCIAL THREE PHASE

Access Fee
Energy Charge

$38.00
$0.10850


OPTIONAL SMALL COMMERCIAL TIME-OF-USE-SERVICE SINGLE PHASE
On Peak: Monday - Saturday, 12:00 p.m. - 10:00 p.m. (October through April)

Off Peak: All other times

Access Fee
On-Peak Energy Charge
Off-Peak Energy Charge

$28.00
$0.16300
$0.06700


OPTIONAL SMALL COMMERCIAL TIME-OF-USE-SERVICE THREE PHASE
On Peak: Monday - Saturday, 12:00 p.m. - 10:00 p.m. (October through April)

Off Peak: All other times

Access Fee
On-Peak Energy Charge
Off-Peak Energy Charge

$38.00
$0.16300
$0.06700


LARGE COMMERCIAL

Acess Fee
Energy Charge
Member Demand Charge

$140.00
$0.05900
$12.15


LARGE COMMERCIAL COINCIDENTAL PEAK

Acess Fee
Energy Charge
Member Demand Charge
Demand - TSGT Coincident Peak

$140.00
$0.04204
$5.25
$19.34


INDUSTRIAL-DISTRIBUTION VOLTAGE 12kV

Access Fee
Energy Charge 
Member Demand Charge
Demand - TSGT Coincident Peak

$140.00
$.04204
$6.65
$19.34


INDUSTRIAL-TRANSMISSION (46kV and 115kV)

Access Fee
Energy Charge
Member Demand Charge
Demand - TSGT Coincident Peak

$140.00
$.04400
$2.65
$19.34


GENERAL MUNICIPAL SERVICE

Access Fee - Single Phase
Access Fee - Three Phase
Energy Charge

$28.50
$38.00
$0.11300


SECURITY AREA LIGHTING

Mercury Vapor

Mercury Vapor - 175W
Mercury Vapor - 400W

$14.99
$28.45

High Pressure Sodium

High Pressure Sodium - 100W
High Pressure Sodium - 250W

$12.04
$21.36


STREET LIGHTING-DMEA-OWNED

Mercury Vapor 

Mercury Vapor - 100W
Mercury Vapor - 175W
Mercury Vapor - 250W
Mercury Vapor - 400W

$12.21
$17.09
$23.04
$32.39

High Pressure Sodium

High Pressure Sodium - 70W
High Pressure Sodium - 100W
High Pressure Sodium - 150W
High Pressure Sodium - 250W

$11.31
$13.73
$17.04
$24.32

LED

LED < 75W
LED >75W

$6.87
$12.16


GREEN TARIFF

Green Power Pass-On per 100 kWh Block                                                                                                      

Current Rate + 1%


NET METERING

Residential Energy Credit
Small Commercial Energy Credit
Large Commercial Energy Credit

$0.1045
$0.1085
$0.0590


CO-Z LOOP TARIFF

Horizontal Loop 
2-Ton Loop
3-Ton Loop
4-Ton Loop
5-Ton Loop
6-Ton Loop

$14.26
$21.39
$28.52
$35.65
$42.78

Vertical Loop
2-Ton Loop
3-Ton Loop
4-Ton Loop
5-Ton Loop
6-Ton Loop

$29.56
$44.34
$59.12
$73.90
$88.68


AGRICULTURE SMALL IRRIGATION SINGLE PHASE

Access Fee
Energy Charge
Member Demand Charge

$40.00
$.08100
$4.60


AGRICULTURE LARGE IRRIGATION THREE PHASE

Access Fee
Energy Charge
Member Demand Charge

$140.00
$.08400
$8.25


OPTIONAL AGRICULTURE SMALL IRRIGATION TIME-OF-USE

Access Fee
Energy Charge – per kWh
Member Demand Charge

$40.00
$.06500
$14.75

Member demand will be measured M - Sat, 12pm - 10pm, excluding New Year's day, Memorial Day, Independence Day,
Labor Day, Thanksgiving Day, and Christmas Day.


COMMUNITY SOLAR ARRAY

Energy Charge per kWh (credit)

$0.10450

INCOME QUALIFIED COMMUNITY SOLAR ARRAY

Energy Charge per kWh (credit)
Energy Charge per kWh
Net Energy Credit per kWh

$0.1045
$0.0400
$0.0645


INTERCONNECTED GENERATING FACILITIES

Access Fee
Energy Charge – per kWh
Member Demand Charge – per kW

$85.00
$0.1030
$3.25

 

 

 

Powered by Touchstone Energy Cooperatives Logo